Slow progress is being made in the future chicken lot area. Lee installed the 6th corner post today and has one more to do before going on to the H-braces. The hot weather, Lee hurting his foot again, and me not being able to help due to some health issues has all conspired to slow down this project.
The future gate placement has been figured out. We are going to put in a 12 foot gate due to the well head being inside the pen. That way if something goes wrong, a repair truck can make it’s way into the chicken pen without any trouble. A post was also put beside the barn in two areas where it will meet up. Lee didn’t want to attach anything to the barn sides as we will be doing barn repairs in the future.
